T: 01489 601742 | M: 07715 273667 | E: aairs.ltd@gmail.com
Alsop Air & Infra-Red Services
Circa 1950's ‘no fines’ constructed blocks needing evaluation of heat loss via uncontrolled air leakage and building fabric had both air pressure testing and thermal imaging to identify specific areas needing improvements to ensure these where fully considered and incorporated into the improvement works to ensure the maximum improvement.
This refurbishment scheme was a pilot scheme prior to the rollout of larger scale refurbishment projects. The improvements included external wall insulation (ewi), new gas central heating, mechanical ventilation with heat recovery and installation of PV panels. Post refurbishment works testing has been carried out to confirm the improvements achieved with the thermal imaging clearly showing the reduction in heat loss.